finaldrillingreport
sidewallcoreanalysis
completionreport
05_Painted

After painting

 

018

Looking at drilling rig on B-13 from the B-9 location

 

016

B-9 Pumping Unit before paint

 

015

These are sample bottles used by our Chemical supplier with a very good oil cut and saltwater from the B-9